HS FOOTBALL SCOREBOARD
Friday’s Games:    New Philadelphia 28 Dover 18 4Q / Indian Valley 7 Claymont 6 4Q / Garaway 21 Ridgewood 21 3Q / Newcomerstown 58 Buckeye Trail 7 FINAL / Strasburg 34 Tuscarawas Central Catholic 14 4Q / Sandy Valley 28 Tusky Valley 26 3Q / Fairless 21 Tuslaw 14 4Q / Vienna Mathews 21 Conotton Valley 14 4Q / East Canton 21 Malvern 6 3Q / Carrollton 21 Minerva 10 3Q / Harrison Central 55 Buckeye Local 7 3Q      
menu Home
Local News

MWCD cuts ribbon on new Quarry Trail at Clendening Lake Dam

| April 29, 2026

TIPPECANOE (WTUZ) (April 29, 2026)  – The Muskingum Watershed Conservancy District is celebrating a milestone in its long-range trail effort—unveiling the first completed project from a 20-year master plan aimed at expanding hiking and biking opportunities.

The new Quarry Trail at Clendening Dam Park measures 1.3 miles, with a natural surface.

Trails Coordinator Dylan Sayer says the opening stretch highlights the Halderman Stone Quarry—once a major Tippecanoe-area business before it was decommissioned in 1906.

Sayer says the path was hand-built, highlighting native wildflowers and scenic quarry views.

The route takes visitors through the quarry, into a wooded stretch, and then loops back.

MWCD Chief of Recreation Pete Novotny says projects like this are designed to help connect people with the outdoors—and with each other—while boosting local tourism and revenue.

The project is a partnership with the U.S. Army Corps of Engineers, since the parking lot and walk to the Quarry Trailhead cross its property. The MWCD reminds visitors to stay on the marked path and leave plants undisturbed.  The Quarry Trail is now open at Clendening Dam Park.

Written by